Kondapur Flyover Work Progressing at Snail’s Pace | Nearby News
logo
Civic Contacts
Home
Newsletters
Stories
Events
LifeStyle
Business
Administration
Politics
Entertainment
Startups

Hyderabad

Kondapur Flyover Work Progressing at Snail’s Pace
Greater Hyderabad Municipal Corporation GHMC officials maintain that the forest department clearance and land acquisition are the main reasons behind the delay
G
Guru Prasad
Hyderabad
Tue Jun 29 2021
share via :
Kondapur Flyover Work Progressing at Snail’s Pace
A -
A +

The Kondapur multi-level flyover or grade separator work at Botanical Gardens and the Kondapur Junction was taken up in 2018 as a part of the strategic road development plan or SRDP at an estimated cost of Rs 263.09 crore. However, the work is progressing at a snail’s pace, causing much inconvenience to those living in the vicinity. 


However, the Greater Hyderabad Municipal Corporation (GHMC) officials maintain that the forest department clearance and land acquisition are the main reasons behind the delay. Also, four major properties are still pending due to land acquisition issues. 


Meanwhile, one SRDP official assures that 50 per cent of the work was complete and the remaining would be completed this month. The road widening work has been on, and 79 pillar foundations have been laid. 


As per GHMC officials, about 160 properties need to be acquired for the flyover, though they are yet to hand over a few. The 3 km flyover connects lanes and underpass of 470m length and 11m width. The four-lane one-way flyover from Gachibowli will be covering the Botanical Garden junction at the first level. It will split into three lanes towards Hi-Tech city by crossing Kothaguda and Kondapur junctions. 


A two-lane ramp from Botanical Garden will join the flyover. Due to this, Hi-Tech city and Allwyn Crossroad-bound traffic will have to take a U-turn for Gachibowli.


Get your local newspaper delivered to your Email at 7am everyday
Select City
Select City

FOLLOW US

Kondapur Flyover Work Progressing at Snail’s Pace
Kondapur Flyover Work Progressing at Snail’s Pace
Latest Articles
Artificial Intelligence In Medtech, The Game Changer For City Startups
Artificial Intelligence In Medtech, The Game Changer For City Startups
GHMC Steps Up Measures In A 100-Day Mosquito Reducing Drive
GHMC Steps Up Measures In A 100-Day Mosquito Reducing Drive
83 Children Forced into Begging Racket Rescued By City Police
83 Children Forced into Begging Racket Rescued By City Police
Orange Peels, Rose Petal Fabrics are on the Hot List of This City Designer
Orange Peels, Rose Petal Fabrics are on the Hot List of This City Designer
Covid Blues Hitting The Schools Hard As Admissions Drop Drastically
Covid Blues Hitting The Schools Hard As Admissions Drop Drastically
Work From Home: Two Sides of a Coin
Work From Home: Two Sides of a Coin
Rains Bare the Shoddy Road Work of GHMC
Rains Bare the Shoddy Road Work of GHMC
Depression Takes Away Life Of Food Delivery Executive
Depression Takes Away Life Of Food Delivery Executive
City Entrepreneur's Winning Idea of Mobile She-toilets
City Entrepreneur's Winning Idea of Mobile She-toilets
Reactors Explode At A Pharma Company In Jeedimetla
Reactors Explode At A Pharma Company In Jeedimetla
Related Articles
Elevated Corridors, Underpasses Soon at Suchitra Junction
Elevated Corridors, Underpasses Soon at Suchitra Junction
100 Million USD Investment In Genome Valley
100 Million USD Investment In Genome Valley
Kondapur Flyover Work Progressing at Snail’s Pace
Kondapur Flyover Work Progressing at Snail’s Pace
ORR Service Roads Expansion To Cost 312 Crore!
ORR Service Roads Expansion To Cost 312 Crore!
KTR Updates About The Upcoming Rail Coach Factory in Telangana
KTR Updates About The Upcoming Rail Coach Factory in Telangana
Center issues Notification for Preparing Consultant for RRR
Center issues Notification for Preparing Consultant for RRR
Kukatpally 4 Lane RuB ready for Inauguration
Kukatpally 4 Lane RuB ready for Inauguration
163 Kilometers of Cycling Track in IT Corridor
163 Kilometers of Cycling Track in IT Corridor
Demolished Mosque in Secretariat will Come-up in a Wider Area
Demolished Mosque in Secretariat will Come-up in a Wider Area
RGIA is Top-class With Lots of Greenery
RGIA is Top-class With Lots of Greenery
INR 750 Crore Sanctioned for Hyderabad RRR
INR 750 Crore Sanctioned for Hyderabad RRR
Hyderabad to get Facelift with INR 11,000 crore
Hyderabad to get Facelift with INR 11,000 crore
New Secretariat Building Sanctioned INR 610 Crore
New Secretariat Building Sanctioned INR 610 Crore
Subscribe to our Newsletter
Get your local newspaper delivered to your Email at 7am everyday
Select City
Select City
logo
nearby news
hi@nearbynews.in
Gachibowli, Hyderabad - 500032
nearby news © - 2021